Product Detail :
|
Work of kaleshwaram project link addition 1.10 tmc drawland lifting of 1.10 tmc of water per day (361 cumecs) of ffc to 986 cumecs (3tmc/day) with lining, modifications to cd&cm works from km 95.275 to km 122.000 (2 packages) in undersigned.
|